The following works were carried out:
- Excavation of trenches or channels for irrigation or drainage networks in soil or semi-rocky terrain.
- Deepening and widening of riverbeds or streams using mechanical equipment.
- Excavation of loose soils.
- Production, transportation, placement, compaction, and maintenance of concrete for constructions using C20/25 grade concrete.
- Arched floodgate and blocking beams for arched floodgates.
- Automation of arched floodgate operation.
- Electrically operated lifting mechanism of monorail type with a suspended grab system, claw type.
- Measurement of dam instruments.
- Communication and Data Management System (Recording unit).
- Automation of arched floodgate operation.