Cleaning, sediment removal and flood protection works on streams in North Evia, following the 2021 wildfires. The project restored the flow capacity of the streams and strengthened the protection of local settlements and infrastructure.
LocationNorth Evia
Extent~70 km of streams
Period2022–2024
Main works
- 01Mechanical deepening and widening of stream beds
- 02Removal of debris and sediment from stream beds
- 03Riprap protection of beds and slopes with 4–6 tonne natural boulders
- 04Reinforced concrete jacket to strengthen a bridge pier
- 05Installation of Ø1200 concrete pipes