Completion of projects for the protection of riparian areas and supply of T.O.E.B. network with gravity from the Girtoni dam on the river Pinios of Larissa.
The following works were carried out:
Construction works, bank and slope protection works, road works – road paving and other protective structures.
Concrete works (construction of a diaphragm) and second-stage concrete work on waiting slots.
Piping – networks.
Electromechanical works (arched gate, barrier beams, automation of arched gate operation, monorail hoist with grab system, measuring equipment, energy supply system, web software).
Translated with DeepL.com (free version)