The following works were carried out:
- Earthworks on natural ground and creation of the required slopes.
- Construction of a drainage layer for the playing field using PTP180 material.
- Leveling and compaction of the final earthwork surface.
- Creation of a drainage channel around the perimeter of the playing field.
- Complete installation of synthetic turf.
- Construction of a perimeter wall.