Riverbank protection works and gravity supply of the irrigation network from the Gyrtoni weir on the Pineios river. They include earthworks, concrete structures and the installation of a radial gate with automated operation.
LocationGyrtoni, Larissa
GateRadial, motorised
ConcreteC20/25
Main works
- 01Excavation of ditches and canals for irrigation and drainage networks
- 02Deepening and widening of the riverbed
- 03C20/25 concrete structures
- 04Radial gate with electric hoist and automated operation
- 05Measuring instruments and data logging and management system